Category: Medical Technology Installation

Beaumont Health Tyner Center for Cardiovascular Interventions Hybrid OR

Project Scope: Hybrid Operating Room Construction above the existing Emergency Department. Work included “flying” bridge to connect to Main Hospital, Control Room and Educational “Viewing” Platform Size: 11,000 square feet Cost: $5.3 Million Client: Beaumont Health Architect: Harley Ellis Devereaux Contract Type: Modified Design Build